Overview

A Phase I, Phase II, BEA, asbestos abatement, and Due Care were needed to provide liability protection and guide future land use of a former service station with underground storage tanks.
Petroleum,Hydrocarbons, Asbestos
Northern MI

Equipment

Solution

Global was retained by the Michigan Department of Natural Resource (MDNR) to conduct a Phase I Environmental Site Assessment (Phase I ESA) in conformance with American Society for Testing and Materials (ASTM) Standard E 1527-13, at a site in Northern, MI.

Results of the Phase I ESA indicated recommended environmental conditions existed and a Phase II Investigation was recommended.  The Phase II consisted of utilizing a truck mounted Geoprobe to install ten (10) soil borings.  Soil and groundwater samples were collected.  Several compounds in both soil and groundwater exceeded generic Part 201 criteria; therefore, the subject property was be considered a “facility” according to Part 201 of the Natural Resources and Environmental Protection Act (NREPA), 1994 PA 451 and a Baseline Environmental Assessment was conducted.

No items found.

Ready to discuss your project requirements with an engineer?

Our process starts with a free consult and site visit to understand the specific needs of your unique project.