Phase I, Phase II, and BEA
Overview
Equipment
Solution
Global was retained by the Michigan Department of Natural Resource (MDNR) to conduct a Phase I Environmental Site Assessment (Phase I ESA) in conformance with American Society for Testing and Materials (ASTM) Standard E 1527-13, at a site in Northern, MI.
Results of the Phase I ESA indicated recommended environmental conditions existed and a Phase II Investigation was recommended. The Phase II consisted of utilizing a truck mounted Geoprobe to install ten (10) soil borings. Soil and groundwater samples were collected. Several compounds in both soil and groundwater exceeded generic Part 201 criteria; therefore, the subject property was be considered a “facility” according to Part 201 of the Natural Resources and Environmental Protection Act (NREPA), 1994 PA 451 and a Baseline Environmental Assessment was conducted.